Exterior commercial painting in Miami-Dade

An exterior repaint in Miami-Dade is often decided at a city counter before it is decided on a ladder. Several cities review the color, and the rainy season runs from May 15 to October 15.

A worker in a hard hat on scaffolding, working on the stone facade of a building.

Color rules vary city by city. Coral Gables sends every exterior paint job to its Board of Architects, with exact colors and swatches. North Miami Beach requires a paint permit in commercial districts and a base color with a light reflectance value of 35 or more. Miami Springs limits commercial buildings to its palette, up to three colors.

In the City of Miami, painting needs no building permit unless the work affects the stucco, and then it does. Stucco cracks and spalls found during prep are a common reason a simple repaint turns into a permitted repair, so Romco looks for them on the site walk.

The National Weather Service puts the South Florida rainy season at May 15 to October 15. In those months Romco schedules exterior coats around the weather and leaves room for days when walls do not dry in time.

See how color review works in one city: Coral Gables

Order of work

  1. Walk all elevations and check the stucco
  2. File the city color review or paint permit if the address needs one
  3. Pressure wash with wash water kept out of storm drains
  4. Repair stucco and seal cracks under any required permit
  5. Prime and apply finish coats elevation by elevation
  6. Walk the punch list and hand over the approved color schedule

What usually goes wrong

Where this kind of job slips in Miami-Dade, and the control

Color rejected late

A color picked before the city reviews it can be sent back. Romco files the color application first and orders paint only after approval.

Stucco damage under the paint

Pressure washing often exposes cracked or hollow stucco. In the City of Miami that work needs a permit, so it is scoped and permitted before coating.

Afternoon storms

Rain on a fresh coat means redoing it. Elevations are sequenced so each wall has time to dry before rain, with weather days held in the rainy-season schedule.

Outside scope

Structural stucco and concrete repair, window and glazing replacement, and roofing are coordinated with licensed firms. Romco will not start finish coats before a required color approval is in hand.

Questions

About exterior commercial painting

Which Miami-Dade cities review exterior paint colors?

Coral Gables, Miami Beach, North Miami Beach, Miami Springs and Bal Harbour all have a published color rule or review. The city pages on this site set out each one.

Can exterior painting be done in the rainy season?

Yes, with a different schedule. Romco plans exterior coats around the weather between May 15 and October 15 and builds weather days into the sequence instead of promising a date.

What does a commercial repaint cost?

It depends on surface area, height, access, the condition of the substrate and the rules at the address. A coastal tower on swing stages and a one-story strip center inland are different jobs. Romco walks the building, writes the scope down and quotes that scope. No figures appear on this site because a number given before the walk would not hold.

What size of building will Romco quote?

Any size. A single storefront bay, a full office floor, a Doral distribution warehouse or a coastal condo tower all get the same process: a site walk, a jurisdiction check and a written scope.

Is Romco licensed?

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. It manages painting as part of that work.

How Romco runs it

The same six stages, every job

  1. Site walk and jurisdiction check

    Romco walks the building, measures the surfaces and confirms whether the county or a city building official governs the folio.

  2. Approvals and colors

    Any color board, historic review, zoning permit or roof-coating permit the address needs is filed before materials are ordered.

  3. Phasing and protection

    Work is split around open tenants, residents and traffic. Floors, glazing, landscaping and storm drains are protected before prep starts.

  4. Surface prep

    Cleaning, scraping, patching and priming, with wash water kept out of storm drains as county and city rules require.

  5. Coating application

    Coats go on in the order the system calls for, with exterior work timed around rainy-season weather.

  6. Punch list and turnover

    Romco walks the finished work with the owner or manager, fixes the punch items and hands over the color and product schedule.

Exterior commercial painting throughout Miami-Dade, including Miami, Miami Beach, Hialeah, Coral Gables, Doral, Homestead, Miami Gardens, North Miami, North Miami Beach, Aventura, and every other Miami-Dade city.

Other painting work

More commercial painting Romco quotes

Commercial painting anywhere in Miami-Dade